Terry Q Koch

Documented work across Connecticut based on attributed municipal records.

Reported work volume$967KDocumented jobs
Average project$121KWhere values are reported
First observed2019Available dataset
Categories3Observed work types
Used for work inNorwalk5 jobsStamford3 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

No contact information was found in the available records.

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 136 Main St, Norwalk, CTSatellite view
2025

136 Main St

Norwalk, CT
  • 2025Mech Alt Comm

    Emergency product line repair. Sawcut concrete and blacktop to expose product lines for repairs, backfill, and repair disturbed areas.

    $75K
Satellite view of 1335 Hope St, Stamford, CTSatellite view
2024

1335 Hope St

Stamford, CT
  • 2024Building Permit

    Fuel tank and product line replacement for an existing gas station. Replace related concrete and disturbed blacktop. 3/8/2024: A fourth 550-gallon tank was found and removed, and added to the job description for P-23-549. Cost to be reflected in the Final Cost Affidavit required to close the building permit. MTC.

    $165K
Satellite view of 10 Chestnut Hill Rd, Norwalk, CTSatellite view
2020

10 Chestnut Hill Rd

Norwalk, CT
  • 2020Mechanical

    To remove existing 3 tank replace with 1 8,000-gallon tank and 1 8000 gallon split 4/4 K also related piping and new fuel dispenser and relocate petroleum accessories. Remove and replace concrete tanks and drive pads and fuel dispenser islands. Also relocate electrical work.

    $150K
Satellite view of 316 Long Ridge Rd, Stamford, CTSatellite view
2020

316 Long Ridge Rd

Stamford, CT
  • 2020Building Permit

    Remove 4 existing underground fuel tanks, related piping, concrete drive pads, dispenser island, and fuel dispensers. Replace 2 underground fuel tanks (1 12,000 gallon and 1 12,000 gallon 7/5 split), related piping, concrete drive pads, fuel islands, fuel dispensers, and other petroleum accessories. Also remove and replace the canopy and canopy footings.

    $285K
Satellite view of 136 Myrtle Ave, Stamford, CTSatellite view
2019

136 Myrtle Ave

Stamford, CT
  • 2019Building Permit

    To remove 3 6,000 gallon underground fuel tanks replace with 2 10,000 gallon underground fuel tanks (0ne 10k and the other 5k/5k split), remove and replace related piping and concrete drive and tank pads, and other related petroleum accessories. Also remove and replace the existing fuel dispensers to the existing fuel dispenser bases.

    $150K
Satellite view of 2 Winfield St, Norwalk, CTSatellite view
2019

2 Winfield St

Norwalk, CT
  • 2019Plumbing

    Plumbing: remove and replace the underground fuel tank, fuel dispenser, related piping and other accessories, concrete tank pads, drive pads, and dispenser island.

    $135K
Satellite view of 206 Main St, Norwalk, CTSatellite view
2019

206 Main St

Norwalk, CT
  • 2019Mechanical

    Mechanical - remove 1000 gallon underground oil tank and replace with 500 gallon above ground.

    $4K