9 14 2026 Trumbull
Trumbull, CT- 2026Plumbing
1 full bathroom, and kitchen on first floor remodel.
$10K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
1 full bathroom, and kitchen on first floor remodel.
$10KNew gas line from new gas meter to boiler.
$6KPlumbing Work
Gas piping Finish roughly space for finish section); for stove, fire place, water heater, and 3 furnaces 1/2 of the unfinished basement to improve laundry and provide play kids. Project to include framing and drywall; replacing windows (in the flooring; sectioning areas; creating closet to access plumbing;
$4K1/2 Gas line Supply and from new tank locateion to stove. Install 80amp 480v breaker and supply voltage wiring from existing.
$1KGas piping Plumbing for stove, 2 furnaces, 2 tankless water heaters, and fire place for 3-1/, 2 bathrooms kitchen, laundry on first floor. 1 full bathroom on the.
$10KSecond floor. Foundation 2 tankless water heaters in basement only for New Residence. 2 bedrooms, 2.5 bathrooms, 2 car attached.
$30KPlumbing / rewire Demo for 4-1/2 bathrooms, kitchen, laundry, and water heaters master bathroom new exhaust fan, recessed lights, add hot tub.
$30KRunning gas Remove old pipe for stove, fire place, water heater, and 2 furnaces indoor oil tank from basement. Install new indoor oil tank in same place.
$5KFirst floor: Kitchen (sink, dishwasher, ice maker). Bath: toilet, sink, and tub. Second floor: Laundry (supply and drain box, floor drain). Bath: toilet, sink, and shower. Gas pipe from 3 meters to 3 HVAC units in attic.
$36KPlumbing for 4-1/2 bathrooms, kitchen, laundry, and water heater.
$30KPlumbing for 4-1/2 bathrooms, kitchen, laundry, and water heater.
$30K3 units: First floor—kitchen: sink, dishwasher, and ice maker; bathroom: toilet, sink, and tub. Second floor—laundry: supply and drain box, floor drain; bathroom: toilet, sink, and shower. Gas: gas pipe from 3 meters to HVAC units in attic.
$36KPlumbing for 2 lavatory sinks, 1 toilet and 1 shower door.
$5KSink rough and install. 7. DWL to new fixtures.
$2.4KIst floor bathroom- remodel shower- toilet sink. Second floor addition 4 lavatory sinks, 1 shower, 1 tub and laundry hook up-, and 2 toilets.
$25KGas pipe for stove, water heater and 2 furnaces.
$5KFirst floor: half bathroom and kitchen, with toilet and sink; second floor: full bathroom, with toilet, sink, and bathtub; basement: full bathroom, with toilet, sink, and shower.
$18KPlumbing Work
New plumbing for basement bathroom with sewage ejector - 1shower, toilet and lavatory sink.
$4KGas pipe - 1. build manifold on end off existing gas main. 2. 3/4 to furnace in attic 3. 1/2 gas to water heater in basement. 4. 1/2 gas to furnace in bsmt.
$2KRemodel -first floor -1kitchen, 1 half bathroom-- second floor 1 full bath, 1 laundry 3rd. floor-1 full bath. 50 gallon water heater installation, gas water heater furnace furnace in attic.
$14KFirst floor: Change kitchen sink and bathtub, and install new fixtures. Second floor: Change shower valve and drain.
$6K(shower, sink, toilet)1 40 gallon electric water heater(ro be in basement.
$55KPlumbing Work
Gas line to stove from existing port in basement, 1 shut off in cabinet.
$500Second floor - bathroom remodel, repipe drainage and venting for 2 sinks, new shower valve and drain, install toilets, sink, new stops and shower trim.
$3KPlumbing Work
Plumbing Work
Plumbing Work
Bathroom second floor rough in - 1 bath, 1 shower, 1 toiler, 1 vanity Bathroom first floor rough -, 1 sink, 1 toilet Kitchen rough -, 1 sink, and dishwasher.
$6KAdd (1) bay sink, (1) hand sink, and (1) ice maker.
$3KPlumbing: remodel 3 full bathrooms on the second floor.
$10KPlumbing: Run lines for pump station at Seaview Park.
$4KPlumbing - First floor: 1 Kit. Sink, 1 Toilet, 1 bath. Sink. Second floor: 2 Toilets, 4 bath. Sinks, 2 bath. Tubs.
$9KMechanical — gas pipe for furnace in attic.
$100Plumbing: disconnect kitchen on the third floor, Unit 2.
$400