66 Pelham La
Ridgefield, CT- 2026Electrical
Install 60-amp 250 Poop Panel Circuit to exterrior of house.
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Install 60-amp 250 Poop Panel Circuit to exterrior of house.
Install 4 arc-fault/GFI devices; relocate 20-amp; install 4 outlets.
Install 2 20-amp circuits to the kitchen area, 1 15. 3 switches, 3 outlets, and 3 light fixtures. Existing 100-amp service.
Check all outlets and wall switches for correct wiring.
Install 4 unc lights; install 2 recessed lights; 1 switch; 7 light fixtures. Existing 100-amp service. 1 existing meter.
Install 100-amp temporary service.
$1KNew 200-amp service. Install new wiring for the new kitchen, master bedroom, master bathroom, and second-floor hall bathroom. New 100-amp subpanel and new second-floor hallway.
30 devices; install new 20-amp circuits to the kitchen area and add 6 recessed lights; install new circuits to the first-floor bathroom and add a vent fan.
50 devices installed. Kitchen area: Remove all wiring; install all new circuits, recessed lighting, and new outlets. Bathroom: Remove all wiring; install all new circuits, recessed lighting, and new outlets.
Remove all existing wiring. Install new wiring for 2-by-2-foot LED fixtures, new 20-amp GFI circuits, a new 20-amp lighting circuit, new emergency lighting, and new wall switches.
Install 400-amp underground service.
$6KReplace existing 2-meter socket and service riser. Install a new ground rod and extend the water main ground. Receipt 20-1076.
$2.5K15 devices installed; install wiring for a new bathroom and a new closet.
50 devices installed; wire new family room; wire second-floor room.
Remove wiring for water-damaged gas burners; install new wiring for new gas burners and new water heaters. Receipt 20-0450.
$1.2KElectrical work: Install recessed lights, a vent fan, GFI outlets, and a switch; relocate the electrical panel to the second floor. Install 4 switches, 2 outlets, and 10 fixtures.
Install new 20-amp arc fault circuits to kitchen install outlets and recessed lighting. 30 devices total. Exist. 100-amp.
50 devices installed; 200-amp service. Kitchen: install new circuits and recessed lighting. Bathroom: install new circuits and lighting.
50 devices installed; 400-amp underground service. Install underground power to new poolhouse; install device, circuits and lighting for new poolhouse. Amendment (1/15/20): 200-amp service; install 2 200-amp service: 1 main house, 1 pool house.
40 devices installed; remove wiring in kitchen and bathroom areas; install outlets, switches, and recessed lighting.
50 devices installed; 200-amp service; wire new kitchen, family room, laundry room, and bathroom; install new 200-amp service.
35 devices installed; install all new wiring for the kitchen and bathroom areas, LED recessed lighting, arc fault, GFCIs, etc.
40 devices installed; 200-amp service; install new circuits and lighting to kitchen.
Wire 3 new gas boilers.
$10K45 devices installed; install new wiring for the kitchen, bar area, bathroom, and laundry rooms.
Install wiring for a new kitchen and install a new electric panel.
Add 60-amp owner's meter to existing service.
$1.2K35 devices installed. Second floor: install recessed lighting, switches, outlets, and new arc-fault circuits for 2 bathrooms.
200-amp underground service.
$10K80 devices installed; 1 clothes dryer, air conditioning motor, dishwasher, and gas burner motor; install new recessed lights; install new switches, outlets, and arc fault in bedroom, bathroom, and office areas.
Install 22 kW generator. Plumbing: pipe gas line to generator. Receipt 19-0120 for $40 paid.
$10K300-amp service; install a new 3-meter service, 3 100-amp panels, and 1 owner's panel.
$4K25 devices installed; install outlets to code; recessed lighting and arc-fault circuits.
50 devices. Install a GFI outlet in the bathroom, lights, and fan; wire a new d/w and 3aone boiler. Remove the 220 line from the old stove. Wire the new kitchen.
100 devices installed; install 40 cut-in recessed lights, wire new bathroom, wire new kitchen, and wire new laundry room.
10 devices installed. At the front entrance, relocate wires and install 2 recessed lights.
200-amp service; 2-meter service.
$3K27 devices installed; install 8 track lights, 10 outlets, 4 floor outlets, and 5 switches.
50 devices installed; wiring for new family room, master bedroom, and bath.
Install 100-amp temp. panel for tent power; main house, back driveway. Receipt 17-1523 for $40 paid. Special Event is 17-1633.
Special event: install a 100-amp temporary subpanel for a tent. Receipt 16-1869 for $100 paid. Inspection 6/20 at 1:00 PM.
Second floor: Remove 40-amp range circuit; replace microwave duplex outlet with single outlet.
11 devices installed on the second floor. Bathroom: 1 GFI, vent fan, 20 map. Arc fault, 15-amp arc fault, 4 switches, and 3 low-voltage recessed lights.
12 devices installed. Lower level: wire new bathroom and laundry area; 2 20-amp circuits, 2 15-amp circuits, 1 30-amp circuit, 1 GFI, 1 fan, 3 recessed lights, and 5 switches.
25 devices installed. Kitchen area: install recessed lighting, install arc fault, GFI arc fault, and remove old wiring.
68 devices installed; 2 ranges and 2 dishwashers. Remove existing wiring for 2 first-floor apartments; install new wiring, arc faults, and smoke detectors.
9/8/17: Change of contractor and work description. Install 200-amp underground service.
$1.5K30 devices. Install GFI outlets, recessed lights, new duplex outlets, and new arc-fault circuits.
Wire air handlers; wire air conditioning compressor.
$1K22 devices. 1: range, wtr-htr, gasbrnr. Motor, dishwasher; kitchen area: 5 20-amp circuits, 2 15-amp circuits, 8 recess lights, 10 outlets, 4 gfi outlets.
22 kilowatt generator. Note: This permit is for the generator only. Plumbing: Gas line to generator. Receipt 16-2160 for $40 paid.
$10K30 devices installed; install new countertop circuits, GFI, recessed lights, and new outlets.
100-amp temporary service.
$750150 devices installed; 200-amp service. Install outlets, GFI, and switches for new house; install 200-amp overhead service.
Install 100-amp temporary service.
$750Install 10 track lights, 6 emergency lights, 2 exit signs, 10 chandeliers, 2 fluorescent strips, 1 exhaust fan, 30 outlets, and 12 wall switches.
22 kW generator PLUMB: gas pipe generator. Receipt for $40 paid. 17-0152.
$10KInstall 2 PVC 4" conduits from the street into the building. Install 4 2" conduits from the front of the building to the back of the building.
$5KRemove and replace the exterior 200-amp panel.
$1K130 devices installed; 1: rng., clthsdryr, oil burner motor, circulator motor; 200-amp service; install switches, outlets, recess lights GFI - ARC fault.
13 devices installed. Kitchen area: install 2 20-amp countertop circuits, 1 20-amp micro, 5 recessed lights, and rewire, relocate, and install 1 15-amp circuit.
Pool area: install new pool bond/ground to equipment, install new GFI breakers, and check all wiring.
7 devices installed; front porch storage: 2 recessed lights, 1 GFI, 2 surface lights, 1 15-amp arc fault, and 1 hanging light.