20 Westport Rd
Wilton, CT- 2026Plumbing
Plumbing/Gas Permit
$40.2K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Plumbing/Gas Permit
$40.2KExisting. Furnish and install a tank level monitoring system.
$19KThomaston control will install a cellar pro ah6500. Located at the basement. This will provide cooling for the newly install wine room. Condenser will be installed in crawl space. Evaporator will be placed in room next to the wine room. Duct work will be installed on ceiling of wine room.
$17.5KComplete installation of a new water, waste, and vent system to serve the existing fixture layout and new kitchen equipment layout. Complete all plumbing per plans and specifications.
$232KGarage-complete installation of water waste and vent fan new garage plumbing fixtures. Furnish and install plumbing fixtures.
$31.6KFurnish and install new rough plumbing to serve 1 sink, connect to existing services, furnish and install (1) water heater and sink, and hook up appliances.
$21KComplete demo of two existing pantry sinks and associated plumbing - complete rough for one new pantry sink, install 1 sink on existing rough and install, 2 sinks and water heaters.
$22KPlumbing: 1 new sink; install a water heater and sink; connect to existing services; first floor; “Inside Service.”
$11KConnect a new 1-1/2-inch gas line to the existing meter. Extend gas piping to a temporary space heater. Connect gas to the unit as furnished and installed by others. Disconnect gas when heat is no longer required.
$3.8KComplete installation of water, waste, and vent piping to serve the new fixture layout; connect to the existing service; install below-grade sanitary piping to serve new condensate sump pumps; install pump discharge piping from the condensate sump pumps; install plumbing and a grease interceptor for the cafe; insulate domestic water piping; and furnish and install plumbing fixtures.
$330KPlumbing Work
Complete installation of new water, waste, and vent piping to serve new plumbing fixtures; insulate domestic water piping; and furnish and install a water heater and plumbing fixtures.
$265KComplete water, waste, and vent piping to serve the new pantry sink location.
$80KPlumbing - complete demo of exist., install new rough plumbing and connect to exist. services, install water heater, 2 floor sinks, 1 floor drain, mixing valve and relocate exist. storm drain - lobby area.
$39.4KFurnish and install water heaters and fixtures; connect to existing services.
$61.5KPlumbing Work
Plumbing Work
PLU
Disconnect and remove (1) existing oil-fired boiler; furnish and install (2) new oil-fired hot-water boilers. Install a new air separator, expansion tank, pumps, and piping; complete modifications to existing makeup-air louvers; install a new flue to the existing chimney and connect the boilers to existing oil piping; complete control wiring.
$150KConnect to the gas shutoff and second-stage regulator at the exterior of the building, and extend a new gas line to the new pizza oven and gas grill.
$5KComplete water, water, and vent piping to serve new kitchen equipment and sinks and drains; connect to existing services as required and new shower valve, and drinking fountain; E22-0411-Ele No Fee: Wiring for boardwalk kitchen.
$15KPlumbing Work Add To &
Plumbing Work
HVAC
Addition to the cafeteria: install new sanitary waste and vent, create waste and vent, install domestic water piping and storm piping, and complete fixture and appliance hookups.
$191KConnect to exterior propane regulator at outside of building and extend new propane piping to kitchen/appliances and water heater.
$17KComplete oil piping to existing generator form new owner furnished oil tank located in mechanical room; complete fuel oil supply and return piping as rq'd. (per plans apd specs).
$21.4KGas line to generator. Receipt 19-1645 for $180 paid.
Isolate and remove existing boilers; furnish and install 2 gas-fired boilers; connect the new boilers to existing supply and return piping; install flue piping through the roof in place of existing piping; complete air intake piping and reconnect gas piping.
$125KFirst floor: Replace 1 sink (drinking fountain); relocate sink. Amendment (8/18/20): First floor: Move and replace 2 water closets and basins; install 1 bottle filler. Second floor: Install 2 new water closets, 4 new basins, 1 new tub, sink, shower, and clothes washer. Basement: Install 1 water heater and replace sump pump. Complete demolition of existing plumbing; install new rough plumbing to accommodate new layout and connect to existing services.
Disconnect and remove existing boilers; furnish and install 2-amp 1250 boilers; connect to existing hot water supply and return piping; connect to existing gas piping; install a new flue and air intake.
$123KBasement: 7 water closets, 2 basins, 3 sinks, 2 hose bibs, 9 floor-drns.; First floor: 10 water closets, 3 basins, 4 sinks, 2: urinals, floor-drns., hose bibs; second floor.: 8" water closets, sinks, 3 basins, floor-drns.; ; 5 roof drains and storm piping; 3 water coolers, 1 per floor., 3 mop sinks, 2 per floor.; gas-fired water heaters, 5 roof drains and storm piping; gas piping to equipment.; complete installation of waste, water, vent, storm and gas piping for new building per plans and specs.
Complete demolition of existing; install new rough plumbing to serve new toilet rooms, connect to existing, add new elevator sump pump.
$13KComplete installation of rough plumbing to serve 3 toiler rooms. Install new water heater with pump. Furnish and install fixtures.
$85KComplete gas piping from meter to (2) new furnaces and kitchen range, as provided by others.
$6KDisconnect and remove existing expansion compensators. Furnish and install 4 chilled water and 2 hot water expansion compensators and guides, as per plan and specifications for the heating system.
Furnish and install expansion compensators on domestic water piping: 1 on the cold water line, 1 on the hot water line, and 1 on the hot water recirculation line. Install 1 on the storm drain line. Work is as per plans and specifications.
Install rough plumbing for 1 new sink on the second floor; install 1 waster water ejector pump and 1 water heater; connect to existing services as required.
Second floor: 1 new water closet and basin. Replace 2 urinals, 4 basins, and 6 water closets.
Second floor: 2 new water closets, basins, and showers; 1 new sink; 2 water heaters; connect to existing services.
Third floor: Move 5 water closets and replace 4 lavatories; move 2 bidets. Demolish existing fixtures, modify rough at core joints and urinal, and replace lavatories.
Third floor: 2 new sinks, dishwashers, 1 20-gallon water heater, icemaker, coffee maker, and appliances.
Plumbing - rough for new ADA toilet room 1 lavatory, 1 toilet, 1 pantry sink, replace exist. fixtures in core toilet room per plans - 5th floor - "Datto".
$51KMechanical: Install a new gas line from the meter to 2 gas dryers.
$3KPlumbing: complete installation of new plumbing at Space S10475, “Yard House.”
$340KMechanical: Gas piping from the meter location to kitchen equipment and gas-fired rooftop units per plans. Space S10475 — “Yard House.”
$30KMechanical - complete gas piping to 6 roof top units.
$40KPlumbing: Complete installations of water, waste, vent, and fixtures for core.
$350KDisconnect and remove two existing cooling towers. Furnish and install 2 new cooling towers in same location. Cooling Towers to be BAC PT2-079A- 5J1/Q. Furnish and install new steel dunnage under cooling tower per attached engineered drawing. Work to be completed and fee paid under Mechanical Permit TM-19-176 MECHANICAL and ELECTRICAL PERMIT.
$625KThird floor: 4 new water closets and basins, 23 new sinks, 1 mop sink, 1 drinking fountain, 19 ski sinks, 2 SK2 sinks, and 1 5k3 sink. Disconnect and demolish existing fixtures; modify rough plumbing to accommodate the new fixture layout; connect to existing services as required.
First floor: 6 new water closets, 6 basins, 21 new sinks, 1 new floor drain, 1 mop sink, and a drinking fountain; complete, disconnect, and demolish existing; install new rough plumbing for the fixture layout; connect to existing services as required.
Fourth floor: 1 new sink; connect to existing water, waste, and vent piping; rough for 1 new sink.
$35KGas line to generator. Receipt 18-2503 for $40 paid.
Second floor: 7 new water closets, basins, 24 new sinks, and 1 new floor drain. Third floor: 13 new water closets, basins, 47 new sinks, and 2 new showers. Install gas piping from meter to boilers; install new water, waste, and vent piping to serve new fixture layout; water heaters and plumbing fixtures; install medical gas piping and outlets.
Fourth floor: 3 new water closets, basins, 2 new showers, and 1 new sink.
North Building, Third floor: 4 new water closets, 2 new lavatories, 2 new sinks, and 1 new water heater.
Gas piping to generator. Receipt 19-0941 for $96 paid.
First floor: 2 new sinks. Complete TJL and rough for 2 pantry sinks; connect to existing services as required.
Water, waste, and vent to new equipment/appliances on the 3rd and 4th floors. 1 new floor drain; pipe indirect waste from appliances to drains, per plan and spec.
Plumbing - demo 1 lavatory, 1 water closet, re rough and install 1 lave and 1 water closet.
$7KPlumbing: Install new water, waste, and vent to serve the new fixture layout. Install plumbing fixtures, a water heater, and all associated trim.
$165KMechanical — gas piping from meter to rooftop units and lab benches.
$15KPlumbing: Install below-grade sanitary piping to serve basement floor drains and install ejector pumps.
$5KSecond floor: 2 nw: basins, showers, 3 nw: sinks; 3 instantaneous water heater; 1 tank type electrical. Wtr. Htr.; second floor. Connect to exist. water, waste, vent; rough for new fixture layout.
Third floor: 1 new sink and 1 water heater. Install water, waste, and vent to serve the new pantry sink. Install 1 point-of-use water heater and connect to existing pipes.
Second floor: 2 nw: sinks.
Third floor: 4 new sinks (pantry sinks) and 3 electric hot water heaters; connect to existing services; install 3 hot water heaters.
Add 2 supply outlets to garage renovation; add bedroom and bathroom. Amendment (9/13/18): Second floor: move 1 sink; new water heater and sink in existing area; modify existing and install new rough.
First floor: 1 new sink; 1 water heater (10 gallon); 1 wastewater ejector pump. Install water, waste, and vent to serve the new sink location; connect to existing services; install 1 ejector pump and 1 10-gallon water heater.
Basement: 2 new water closets, basins, and sinks; 1 new shower. First floor: 2 new water closets and basins; 1 new sink. 2 water heaters, 30 gallon, in the basement ceiling.
Plumbing - Install new fixture layout, grease interceptor, not water heater and connect to exist. services as required.
$25KMechanical: Install gas piping to accommodate new ranges and appliances—“Aitoro Appliance.”
$6KMechanical: Demolish existing lines going to (2) existing AC units; cap lines in ceiling.
$3.1KPlumbing: Add a mop sink, 1 urinal, 1 toilet, and 1 pantry sink; connect to existing rough-in and replace existing fixture with new.
$12KSecond floor: replace 1 water closet, add 2 new sinks, and replace 5 basins; 2 water heaters and 2 ejector pumps; connect to 2 existing services; install 2 water heaters and 2 ejector pumps (pantry). Amendment (6/1/18): Basement: 1 water closet, basin, shower, and 3 hose bibs; First floor: 1 water closet, basin, and sink; Second floor: 3 water closets, 4 basins, 1 sink, and clothes washer; Third floor: 1 water closet, basin, and shower; gas pipe: stove, boiler, barbecue, and 3 fireplaces.
Disconnect the existing cooling tower and remove it from the site. Furnish a new tower, “bac, ” to match the existing tower, and reconnect it to the existing piping.
$105KFirst floor: 2 new water closets, basins, 1 new floor drain, and 4 new hose bibs. Second floor: 1 new water closet, basin, sink, and floor drain. Install water, waste, and vent per plans and specifications. 1 water heater on the second floor. Gas piping to new rooftop units.
First floor: move 1: sink Install new water heater under sink.; disconnect and remove existing, relocate and rough plumbing to accommodate new sink location in same room; connect to existing water, waste and vent; install new sink and water heater.
Basement: 5 new water closets, 4 new basins, 2 new floor drains, and hose bibs; 1 new sink, laundry tub, dishwasher, and urinal. Second floor: 4 new water closets and basins, 2 new sinks, and 1 new dishwasher and urinal. Third floor: 1 new water closet, basin, and sink. Hot water heater in basement. Complete gas piping as required; complete water, waste, and vent.