Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
EL2
$20KLights in 8 Remove all ice and water different storage rooms. Old shingles and accessories. Install new shingles and accessories. Install shield 6ft feet up on all the eves. Install seam tape between all the.
$25KElectrical Work
$12KElectrical Work
$10K8Electrical Permit and Voice/Data -NOT TO
$12KRemode of elevator electrical. New disconnect for elevator controller, new disconnect for cab lights. New elevator room ligths switch, GFCI outlets.shunt trip disconnect and new fire alarm. Connecting air conditioning split unit.
$13KTemporary service for working trailer.
$1.5KElevator and FAS code upgrades for modernazation of1 4 stop elevator, New disconnects using existing wire from main panel. New disconnect for elevator cab lights. New lights /GFCI in elevator room. New lights/gfc/switch in elevator pit. Wiring of air conditioning split system in elevator room.
$13KELE
Electrical Work
$5KElectrical Work
Pool bonding and wiring for pool equipment.
$5K24 kW generator install.
$14.5KInstall 24 kW generator on existing pool slab.
$14.5KElectrical Work