Remove the existing tub and install a new jetted tub, walls with valve, and shower door. Install new flooring and a vanity. Trades included: E21-0028-Ele No Fee: Bond wire for the jetted tub; P21-0006-Plu No Fee: Remove the existing tub and install a new jetted tub and walls with valve; new flooring and shower door.
Remodel the master bath and hallway bath. In the master bath, replace the shower with a larger shower pan extended into the existing closet (drawing), 4" flooring, and fix or repair any damaged drywall if needed. Remodel the hallway bath with a direct replacement tub, flooring, and fixes or repairs to any damaged drywall if needed. Replace the pocket door.
Bathroom remodel, including drywall, tub-to-tub replacement, and moving the toilet 18" etc. Plumbing and electrical permits to be pulled once the building permit is issued. Price reflects all work per inspector.