Install a 30/60 tent, 20/20 tent, and 20/20 tent for their homecoming event from 9/27/2024 to 9/29/2024.
$4K
2024Building Permit
Installing a 80/150,2- 9/30cc, for their annual graduation on 5/28/2024 to 6/7/2024.
$10K
2023Building Permit
Erect a 30' x 60' tent, a 24' x 24' tent, and a 20' x 20' tent for the Homecoming Celebration from 10/20/23 through 10/22/23 at King School.
$4K
2023Building Permit
Install an 80/130 tent and two 9/30 canopies for their graduation from 5/30/2023 to 6/9/2023.
$10K
2022Building Permit
Installing a 30/60 tent, 24/24 tent, 20/20 tent, for Homecoming on 10/14/2022 to 10/16/2022.
$3K
2022Building Permit
Installing an 80/130 and two 9/30s for their graduation from 5/28/22 to 6/10/22.
$4K
2021Building Permit
Install a 30/60 tent, 24/24 tent, and 20/20 tent for homecoming on 10/23/21 to 10/24/21. The tents are not connected. The main tent is 1800 SF.
$4K
2021Building Permit
Installing a 30/100 tent, 2- 6/14 tents for their fundraiser from 9/7/2021 to 9/25/2021.
$4K
2021Building Permit
Install a 120/180 tent and a 20/30 tent for their graduation, from 5/26/21 to 6/11/21.
$14K
2020Building Permit
Installing a 80/130,2-9/30 tents for their graduation for 5/27/2020 to 6/5/2020 Application withdrawn. BG 7 7 2020.
$10K
2019Building Permit
Installing a 30/60 tent, 24/24 tent, 20/20 tent for their homecoming event on 10/26/19 to 10/27/19.
$1K
2019Building Permit
Install 1 tent, 80-by-130-foot, and 2 canopies, 9-by-30-foot. Erect May 25–26. May 29: High School Prize Day, 500–700 persons. May 31: High School graduation at 5 PM; occupancy: 998 persons. June 1–5: rehearsals. June 6: Middle School Prize Day at 2 PM; occupancy: 250 persons. June 7: Lower School moving-up ceremony at 9 AM and Middle School moving-up ceremony at 1 PM; occupancy: 400–500 persons. Remove June 8–9. Inspection: 5/28 at 7:00.
Installing a 40/120,3- 12/12's, 30/45,20/50,30/45,30/30,30/30,16/16,12/12 6/5cc for their annual fair from 8/27/2024 to 8/31/2024.
$16K
2023Building Permit
Installing a 40/120,12/12,12/12,12/12,30/45,20/50,30/45,30/30,30/30,16/16,12/12 for the annual fair on 8/29/2023 to 9/2/2023.
$16K
2022Building Permit
Installed temporary tents in the following dimensions - 40/120,3-12/12,30/45,20/50,30/45,2-30/30,16/16,12/12 for their annual fair on 8/30/2022 to 9/3/2022.
$16K
2021Building Permit
Install a 40/120 tent, 4-12/12 tents, 3-30/45 tents, 20/50 tent, 30/30 tent, and 16/24 tent for their annual fair from 8/31/21 to 9/4/21.
$16K
2019Building Permit
Installing tents for their annual fair from 8/27/19 to 8/31/19.
Installing a 82 x 98 tent, 30/80 tent, 20/20 tent, 2- 9/20cc, 10/10 tent, for a their Gala on 5/2/2024. they may be using the tents until 5/6/2024 but will be discussed in a meeting that they will be having on 4/10/2024 with the Fire Marshal.
$10K
2023Building Permit
Erect a 30' x 45' white Century Marquee tent for an art installation on 9/16–9/17/23.
$2K
2023Electrical
Installing a 82 x 164 tent, 30/80 tent, 20/20 tent, 2-9/20cc, 10/10 tent for their Annual Gala on 5/4/2023. the tents are staying up from 5/4/2023 to 5/10/2023. They are having three other events as well after the Gala on 5/4/2023. 5/5/2023 5/6/20235/7/2023All from 6:00 pm to 10:30 pm. Fushion Lighting is pulling an electrical permit for Mill River's events. The two site plan are attached. THERE WILL ALSO BE 10 80BTU Propane heaters with 100pd tanks at site as well.
$10K
2022Building Permit
Install a 40/70 tent inside Mill River Park from 11/17/2022 to 12/24/2022.
$10K
2022Building Permit
Installing a 82 x 164 tent 30/80 tent, 20/20 tent, 9/20cc, 10/10 tent, for their Gala Fundraiser from 5/5/2022 to 5/8/2022. We have a Rain Plan for this event as well. (50/80 tent, 9/105cc) if it rains. The client may not take these two tents.
$28K
2021Building Permit
Install a 40/70 tent owned by Mill River for the season from 11/26/2021 to 1/2/2022. Install 2 170K BTU propane heaters with 2 100pd tanks. They are drawn on the site plan. MJS, November 15th.
$2K
2020Building Permit
Installing a 16/20 Tent for the Winter Season.
$1K
2020Building Permit
Installing tents at Mill River Park for their Annual Gala being held on 5/8/20 to 5/10/20.
$28K
2019Building Permit
Install a 40/160 tent from 11/18/19 to 1/5/20. Add 6 propane heaters with 12 100# LP tanks.
$8K
2019Building Permit
Install a 40/70 tent owned by Mill River and a leveled floor for sign-off by a structural engineer. The floor measures 26 by 70 feet, totaling 1820 SF of flooring. The tent is being used as a warming hut. Permit application withdrawn. Tent not moving location.
$3K
2019Building Permit
Install an 82-by-164-foot tent, a 30/80 tent, and a 20/20 tent for the Gala Fundraiser on 5/1/19. Add a 50-by-80-foot tent, a 9-by-105-foot canopy, and temporary heat. Event: 5/2/19 to 5/5/19. Erect 4/30/19. Remove 5/6/19. Inspection: 5/2/19.
Erect a 60' x 120' Anchorspan tent for the Hilton Stamford.
$1K
2023Building Permit
Install a 60/120 tent for the 2023 season for various events.
$2K
2022Building Permit
Installing their 60/120 tent for the season, 3/15/2022 to 9/30/2022.
$1K
2021Building Permit
Install a 60/100 tent for the season.
$1K
2020Building Permit
Installing their seasonal tent for the season, 60/100, from 3/30/2020 to 12/2/2020.
$1K
2019Building Permit
Amending permit #B-19-148 until 12/2/19.
$1K
2019Building Permit
Install fabric on the existing 60/120 tent for the season, from 3/30/19 to 9/30/19. Erect: 3/26/19. Remove: 9/30/19. Inspection: 3/27/19 at 1:130. The structure remains up. No heating, cooking, or generator.
Installing a 30/65 tent, 14/35 tent, 20/30 tent, 12/24 tent, 16/20 tent, 12/24 tent, 9/30cc, 9/10cc, 6/50cc, 6/15cc for a Holiday Party on 12/2/2023. We will have a total of 11 - 80k BTu heater with 11- 100 paid tanks. They will be spread out throughout the tents. We will also have an electrician pull the electrical permit. The cooking will be all electric No Propane. We are also building a leveled floor over our clients pool. We will have an engineer sign off on the floor closer to the event. I will send the Engineer Letter as soon as the inspection of the floor is done.
$13K
2022Building Permit
Installing a 30/30 tent, 20/20 tent, 12/24 tent, 12/12/ tent, 6/10cc, 9/40cc, and 9/40cc for a pholiday party on 12/3/2022.
Installing a 50/100,20/30,9/20cc, for a corporate event on 10/3/2023 to 10/5/2023. Two 30-ton 2 air conditioning Units running of a 125KVA Generator. We will have our electrician pull the electrical permit. LT 9/29/2023.
Erect a 60' x 110', 9' x 10', 30' x 60', and 9' x 20'. On standby: 40' x 80' and 9' x 20'. The decision is due on Tuesday 5/30 at 9:00 am. Event is 6/2/23.
Installing a 20' x 45' tent for a corporate event on 5/16/23. Tent is weighted with 700 lb concrete blocks (16). Power from building. Tent is being placed on their plaza.
Install a 50/80 tent at Mill River on Grass near the Carousel for an event on 5/20/2023.
$2K
2022Building Permit
Install a 30/60 tent for a summer party on 9/27/2022.
$2K
2021Building Permit
Installing a 50/80 tent for a private company event (WWE) Christmas Party on 12/8/2021. The tent is being placed near the Carousel Building. The tent is more than 20 feet away. Rain date: 12/9/2021.
Installing a 40/80 tent for religious services on 9/27/20 and 9/28/20. The tent does not have any sidewall all open and no lights and no heat. Work description change. Tent is 30'x75' with lights. Lights plugged into building outlet. 09-24-20 HJP.
Install a 20/40 tent in the parking lot of 1066 High Ridge Road (Parkway Diner) from 5/22/20 to 6/22/20. The tent is being used for outdoor dining. Applicant withdrew the application and requested a refund. See attached email.