Renovate the basement bathroom. It is currently a 1/2 bathroom with a 24" vanity and toilet. We will add a shower to a 60" opening where we believe the builder ran a 2" pvc drain and hot and cold water supply to make a future shower easier.
Update the master bathroom. Remove and re. Install tile in the shower and bathroom floor, toilet, vanity, and light fixtures. Paint the walls, ceiling, and trim. 50 SF. Trades needed for this jobsite project: Electrical and Plumbing.