Interior alterations to the existing structure for a kitchen renovation. Add 124.5 SF to the rear of the home over the existing patio. Excavate to the depth required for the new footing for the addition only, patch to existing grades, and pour a new foundation for the existing partial patio in the rear of the dwelling.
New expanded family room/dining room over existing screened porch. New expanded to be removed and rebuilt. New deck with pergola at front of house. New deck at rear of house with enclosed screened porch. (A-303) New attached 1-car garage and bedroom. State education fee paid: $31.20. Electrical: NEC. Relocate meter socket to corner of new addition; install 15 new outlets and switches, 10 recessed lights, 4 switches, 10 outlets, and 10 light fixtures. Existing 200-amp service. HVAC: Install hydro air system for new addition and existing kitchen and living room area; install additional line set for future system. Installation will include ductwork, refrigeration piping, and hydro lines. ACCA Manual J.
Install a Bilco door and bulkhead at the rear basement of the home. The Bilco door and bulkhead are being installed by the manufacturer. Footing and framing.