26 Dandy Dr
Greenwich, CT- 2019Plumbing
Cut in a tee and valve in the 1" existing gas line in the boiler room; run a new line through the basement into the garage and up to the gas stove in the living room.
$900
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Cut in a tee and valve in the 1" existing gas line in the boiler room; run a new line through the basement into the garage and up to the gas stove in the living room.
$900New gas line from the boiler room to outside, to a new meter for new equipment: range, boiler, and grill. Amendment (6/24/19): Existing gas pipe to generator set, converted to gas (had been propane).
$15KReplace boiler and add domestic; Peerless. Gas piping installed under 19-1281.
$1KFirst floor: Replace 1 sink and dishwasher; relocate the kitchen sink and dishwasher; reconnect the ice maker to the refrigerator; move the stove 10 ft. And reconnect gas to the stove.
Rerun gas line from gas meter at the corner of the underground house to the back corner of the house, feeding the existing generator.
$600Hang new gas-fired Modine heater; run gas pipe from existing gas to the new heater and test.
$600201800041 – Install gas pipe for a gas fireplace from the existing asline in the crawl area; also add a gas line for a future Modine heater.
$3KReplace water service from curb stop to inside of basement.
$900Replace the heating boiler. Existing 105000 hot water boiler; new boiler: 130000 BTU. Also run a gas line from the garage to the boiler room.
$5KReplace water service from curb stop to inside of building.
$1KSecond floor: replace 1: water closet, basin, 1 nw: shower, clothes washer, floor-drn.
Second floor: Replace 1 water closet and basin; 1 new shower; clothes washer.
$3KSecond floor: Replace 3 water closets and showers; replace 4 basins and 1 tub; 1 new laundry tub, clothes washer, and floor drain.
First floor: Move 1 water closet, tub, basin, sink, and dishwasher.
Gas line to generator. Receipt for $40 paid.
Basement: 2 water closets, basins, and hose bibs; 1 tub, shower, and floor sink; 2 hose bibs. First floor: 1 water closet, basin, sink, and dishwasher. Second floor: 3 water closets and showers, 5 basins, 1 tub, laundry tub, and clothes washer. Install waste, water, and vent piping; 1 future sink; gas to fireplace, boiler, and range.
$450KGas pipe to generator. Receipt 17-0709 for $40 paid.
Basement: 1 nw: water closet, basin, shower, move 1: clothes washer; extent gas line to new with H.
First floor: replace 1 water closet, basin, and sink; install 1 new dishwasher. Second floor: replace 1 water closet, tub, and basin.
Gas pipe for generator; approximately 125 ft. From the meter to the generator. Meter outside the front corner of the house; genset in the rear. $40 paid. Receipt 17-1487.
Run new gas pipe from existing main to new fireplace, lotset; run new gas pipe to new 75 gallon. Water htr. Amendment (5/3/17): add new gas line from exist. house penetration into ground to new gas grill location.
First floor: Replace 1 sink and dishwasher; disconnect sink and dishwasher. Gas to deck, range, and fireplace.
Replace gas-fired boiler and water heater; new boiler net 100.
$6KFirst floor: replace 1 water closet, tub, and basin; move 1 sink and dishwasher.
Install waterline and gas line underground from the existing garage to the new garage for future.
Run natural gas line from the original stub-out at the house to the firepit area and gas grill in the rear of the house.
$600Basement: 1 nw: water closet, basin, shower, move 1: sink, clothes washer; First floor: replace 3; water closets, replace 2: tub, showers, replace 4: basins, replace 1: sink, dhswhsr., 1 nw: clothes washer Amendment (8/3/16): install new gas piping; replace water service.
First floor: 1 clothes washer; run PVC for new washer; run hot and cold water for new machine.