Skip to content

Local provider profile

Wadia Associates

Documented work across Connecticut based on attributed municipal records.

Reported work volume$14.9MDocumented jobs
Average project$2.5MWhere values are reported
First observed2018Available dataset
Categories5Observed work types
Used for work inGreenwich10 jobs

Contact information

Details found in public records

These details have not necessarily been claimed or independently confirmed by the provider.

Phone
(203)966-0739source record

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Satellite view of 636 Lake Ave, Greenwich, CTSatellite view
2021

636 Lake Ave

Greenwich, CT
  • 2021Electrical

    ELE

  • 2021Plumbing

    PLU

  • 2021New Construction

    Construct 1 room detached pool bathroom structure. State ed fee $6.50.

    $25K
  • 2021Pool

    Construct a 1-room detached pool bathroom structure. State education fee: $6.50.

    $25K
  • 2018Electrical

    New construction of a single-family house with finished basement, basketball court in sub-basement, rear patio, rear covered porches, attached 3-car garage, 3-car carport attached by existing greenhouse, elevator, reflecting pools, and courtyard. State education fee paid: $3120.00. Electrical: 200-amp Temporary service.

  • 2018New Construction

    New Construction of a Single Family House with finished basement, basketball court in sub basement, indoor spa, rear patio, rear covered porches, attached 3 car garage, attached (by existing greenhouse)3 car carport, elevator, reflecting pools, courtyard. State Ed. Fee paid.: $3120.00 PLUMB: basement: 2 water closets, basins electrical: low voltage wiring only to include audio speaker wiring, home theater, cable tv and network electrical: 200-amp temporary service. Amendment (8/20/19): 1150 devices installed; 800-amp 3 om service; 1: rng., oven, 2: clthsdryrs, oilbrnr. Motors, 10 circ. Motors, 3 dshwshrs.; recessed lighting, lighting system, outlets, lights, switches, kitchen appliances, hvac system HVAC: nstall 3 water cooled VRF systems along with 27 indoor units; install 3 gas boilers, 2 indirect water htrs., 5 garage unit heaters, 3 zones of snow melt; supplying warm board for radiant floor. (by others) warming; steam humidifiers, humidifiers, HRV's, fans, and 5 makeup air systems; install all nec. Piping, ductwork and final RGD's electrical(3): Install 1 panel, 2 kp, 3 PIR, 46 controls, 8 smokes, 9 cameras, 3???, 1 hi/low, 1 low temp electrical (4): wire 1 indoor spa with 1 light on 1 swtch., 2 2 hp motors, 2 filters, 1 jet pump and 1 Aqualink RS-8 computer system.

    $12M
Satellite view of 9 Sabine Farm Rd, Greenwich, CTSatellite view
2019

9 Sabine Farm Rd

Greenwich, CT
  • 2019Pool

    Remove and demolish the in-ground swimming pool. State education fee paid: $4.68.

    $18K
Satellite view of 38 Meadowbank Rd, Greenwich, CTSatellite view
2018

38 Meadowbank Rd

Greenwich, CT
  • 2018Demolition

    Demolish pool. Utilities disconnected under house demolition permit 18-1197. State education fee paid: $2.60.

    $10K
  • 2018New Construction

    Flood Zone AE 13. New single-family residence on a crawl space foundation, attached 2-car garage, and rear and side terraces. State education fee paid: $728.00. Electrical: 200-amp temporary service.

  • 2018New Construction

    Flood Zone AE 13 New Single Family Residence on crawl space foundation, attached 2 car garage, rear and side terraces.; State Ed Fee paid. $728.00 Amend #1 4.29.21 fee $40 revise rear patio, stair, planter design electrical: 200-amp temporary service. Amendment (8/20/19): 480 devices; 1: rngto, dishwasher, oven, clthsdyr. Oil brnr.motor, , 4 circ. Motors, 4 air conditioning motors; 400-amp underground service; wire all appliances; hvac equipment, a/h and air conditioning lighting, switches, receptacles. Electrical; Low voltage wiring only. To include audio speakers, lighting, wiring cable tv and network. Burglary and fire alarm systm. PLUMB: First floor: 2 water closets, basins, sinks, dshwshrs. Second floor: 4 water closets, 5 basins, 2 sinks, 3 showers, 1 tub, and clothes washer HVAC: install 4 hydro-air systems; install MUA, bath and dryer exhaust. Fans; install humidifiers and energy recovery ventilator; install gas-fired boiler and 80 gallon. Indirect water htr.; install underground piping (blue duct); install garage unit heater (modine); install all nec. Piping, ductwork and RGD's.

    $2.8M