747 Belden Ave
Norwalk, CTRun conduit and install monitor modules off the existing fire alarm.
$7.9KLocal provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Run conduit and install monitor modules off the existing fire alarm.
$7.9KWiring for HVAC upgrade per plans.
$19.3KWiring for HVAC upgrade per plans.
$19.3KElectrical - wiring for HVAC upgrades per plans and specs.
$89.8KElectrical: Wire replacement chiller and 3 pumps.
$7.5KCut and repair concrete for electrical and plumbing work.
$31.5KComplete electrical work per plans and specifications; remove old lights and install new wire, approximately 25 new receptacles.
Grass Island SCADA upgrade project. Install conduit and control wire for a new control system; 9 Cat 6 runs in the admin building; 4 Cat 6 runs in the headworks building; 4 Cat 6 runs in the maintenance building; 4 20 A receptacles in the admin building; and 1 30 A circuit for an 18 k BTU mini-split.
$10KInstall 400-amp, 480v temporary service; remove existing 1200-amp service equipment and install new equipment; install new distribution and panel boards; install new conduits to clarifiers and air blower; install new VFOs and relocate existing equipment; install new lighting fixtures.