10 Hillside Rd
Greenwich, CT- 2020Demolition
Demolition of stadium bleachers. State education fee of $15.08 paid.
$58K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
No contact information was found in the available records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Demolition of stadium bleachers. State education fee of $15.08 paid.
$58KInternational Building Code. Convert existing locker/bathroom into snack bar. State education fee: $5.72. Plumbing: International Plumbing Code. Disconnect water closet and lavatory; rough for 3 compartment sinks. First floor: 2 sinks. Electrical: 5 outlets. Athletic building snack bar.
$21.5KNurses suite expansion, light demo, new walls to create observatory spaces, new finishes. New lighting in 3 observatory spaces, new hvac in 3 observatory spaces. State ed fee paid $19.50.
$75KMiscellaneous alterations to the library, including a new glass partition wall, new lighting, HVAC alterations, and millwork. Construction of 2 new trophy cases in the athletic center. State education fee paid: $12.48.
$48KLessee: Green and Tonic LLC. Removal of 2 walls, flooring, and ceiling tiles. Construction of 2 walls, flooring, and new ceiling tiles; relocation of 2 outlets; and painting. State education fee paid: $4.94.
$18.5KTenant: HYATT REGENCY. Cosmetic alterations to the gazebo bar, including paint, countertops, service station reconfiguration, and minor electrical work, including lighting. State education fee paid: $9.10. Electrical: 10 120V, 20A USB/power receptacles on the outside bar wall.
$35KGypsum wall and ceiling repairs from water damage. Two new access panels. Remove and replace existing outlets and emergency exit signs. State education fee paid: $39.
$150KTenant: Little Beet Table. Interior alteration of the existing restaurant for new finishes, lighting fixtures, and miscellaneous food service equipment. State education fee paid: $19.50.
$75KConstruct new porte cochere, expand multi-purpose room and construct new conf. Room, update interior finishes, replace mechanical systems. Amend #1: 11.6.20 val $25,000 fee $421.50 code modifications approved by OSBI, modifcations concern a number of womens, toilets and firewall construction along gride D State Ed Fee Paid $946.40 HVAC: Disconnect and discard existing equipment and ductwork. Furnish and install 14 Mitsubishi indoor units and 4 Mitsubishi outdoor units. Install all refrigeration piping. Install exhaust fans and makeup air fains. Per mechanical drawings. Electrical: fire alarm; add to existing system; change out devices of existing locations: 1 X extender panel, 5X horn strobes, 12X smokes, 2 X heat, 3X pull stations, 1 X horn strove, 5X strobes. Amendment (7/1/20): 35 X plugs, 10 X GFI, 1 XOc sensors, 30 X switches, 16 ceiling mount OC sensors, 250 light fixtures, 16 exit signs, 4 X AC systems, 15 electrical. Htrs., 3 x 10 A panels, 1 X 150A panel, 25 Bollard lights and post lights, 1000 pvc pipe PLUMB: First floor: 2 nw: water closets, basins, hose bibs, replace 2: urinals, replace 2: urinals, hose bibs, 1 sink 1 nw: floor-drn., dishwasher, sink Amendment (10/5/20): emergency water service from curb key to inside of building approximately 135 ft. Pf, new 1" copper.
$3.6MZone 2 – nave area. Construct a new porte cochere, expand the multipurpose room, construct a new conference room, update interior finishes, and replace mechanical systems. State education fee paid: $946.40. HVAC: Disconnect and discard existing equipment and ductwork. Furnish and install 14 Mitsubishi indoor units and 4 Mitsubishi outdoor units. Install all refrigeration piping, exhaust fans, and makeup air fans, per mechanical drawings. Electrical: Add to the existing fire alarm system and change out devices at existing locations: 1 extender panel, 5 horn strobes, 12 smoke detectors, 2 heat detectors, 3 pull stations, 1 horn strobe, and 5 strobes. Amendment (7/1/20): 35 plugs, 10 GFI, 1 OC sensor, 30 switches, 16 ceiling-mount OC sensors, 250 light fixtures, 16 exit signs, 4 AC systems, 15 electrical heaters, 3-by-10-foot A panels, 1 150A panel, 25 bollard lights and post lights, and 1000 PVC pipe. Plumbing, First floor: 2 new water closets, basins, and hose bibs; replace 2 urinals; replace 2 urinals; hose bibs; 1 sink. 1 new floor drain, dishwasher, and sink.
$3.6MZone 3 – multi-purpose room. Construct a new porte cochere, expand the multi-purpose room, construct a new conference room, update interior finishes, and replace mechanical systems. State education fee paid: $946.40. HVAC: Disconnect and discard existing equipment and ductwork. Furnish and install 14 Mitsubishi indoor units and 4 Mitsubishi outdoor units. Install all refrigeration piping, exhaust fans, and makeup air fans, per mechanical drawings. Electrical: Add to the existing fire alarm system and change out devices at existing locations: 1 extender panel, 5 horn strobes, 12 smoke detectors, 2 heat detectors, 3 pull stations, 1 horn strobe, and 5 strobes. Amendment (7/1/20): 35 plugs, 10 GFI, 1 XOc sensor, 30 switches, 16 ceiling-mounted OC sensors, 250 light fixtures, 16 exit signs, 4 AC systems, 15 electrical heaters, 3-by-10-foot A panels, 1 150A panel, 25 bollard lights and post lights, and 1000 PVC pipe. Plumbing, First floor: 2 new water closets, basins, and hose bibs; replace 2 urinals; replace 2 urinals and hose bibs; 1 sink; 1 new floor drain, dishwasher, and sink.
$3.6MZone 1–sacristy, narthex, and family room. Construct a new porte cochere, expand the multi-purpose room, construct a new conference room, update interior finishes, and replace mechanical systems. State education fee paid: $946.40. HVAC: Disconnect and discard existing equipment and ductwork. Furnish and install 14 Mitsubishi indoor units and 4 Mitsubishi outdoor units. Install all refrigeration piping, exhaust fans, and makeup air fans, per mechanical drawings. Electrical: Add fire alarm devices to the existing system and change out devices at existing locations: 1 extender panel, 5 horn strobes, 12 smoke detectors, 2 heat detectors, 3 pull stations, 1 horn strobe, and 5 strobes. Amendment (7/1/20): 35 plugs, 10 GFI, 1 XOc sensor, 30 switches, 16 ceiling-mounted OC sensors, 250 light fixtures, 16 exit signs, 4 AC systems, 15 electrical heaters, 3-by-10-foot A panels, 1 150A panel, 25 bollard lights and post lights, and 1000 PVC pipe. Plumbing, First floor: 2 new water closets, basins, and hose bibs; replace 2 urinals; replace 2 urinals; hose bibs; 1 sink. 1 new floor drain, dishwasher, and sink.
$3.6MInternational Building Code (IBC) 2015. Construct a new entry ADA ramp and new ADA bathroom; construct a new portico; construct new retaining walls. State education fee paid: $84.50. 10.8.19 change of contractor: $40.
$325KLessee: Jed Simon. Old Greenwich Social Club. Break through the wall to the space next door. Interior work only. State education fee paid: $2.60.
$10KOffice suite repairs. Removal and replacement of BYP. Walls, ceilings, and flooring. Paint affected area. State education fee paid: $9.10.
$35KRepair of water damage on the first and second floors of Cos Cob School. JV#08543. State education fee of $78 paid 11.20.18. Change of contractor: $40. Electrical – see electrical permit 18-3131. Electrical repairs due to water damage at the Cos Cob School building – Ton Anderson, electrician. Electrical: 65 devices installed; replace electrical outlets, switches, and lights affected by water.
$300KGlenville Fire House: Repair wall and replace the window damaged in an accident. Repair and replace the HVAC unit and monument. State education fee paid: $12.48. HVAC: Replace the damaged condensing unit as a direct replacement due to an auto accident. Electrical: 6 devices installed; building and monument repairs due to a car accident; remount electrical and wire the new outdoor air conditioning condenser replacing the unit damaged in a car accident; replace the damaged monument landscape light fixture.
$47.7KZone 2C: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4L2: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3C: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4O. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3l1. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4J. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4K: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-N – Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-P: Remove and replace ceiling, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-G – Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2K. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2H1. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4L: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4D. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3H1. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-J: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3N. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2L. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2L2: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2m. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3-na. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4B: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZONE 4F - Remove and replace ceil'gs, floor covering, and wall covering in the Tower on floors 1-4. State ed fee paid $185.12.
$712KZone 3o. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3P: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4L1. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3A: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3K: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-E: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2NA. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4H: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2P. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-H1. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1-4. State education fee paid: $185.12.
$712KZone 2E: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4C: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2D2. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-L: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4D2. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2J: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3L2. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZONE 3J: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3B: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-NA. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4E: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-D2. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4-NA. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
Zone 2L1. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3H. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2–MA. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2H. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-F – Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-O: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-A: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-C: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3L: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2G. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4P. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3M. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-M – Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2A: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4-MA – Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3E: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4A. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-MA. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1-4. State education fee paid: $185.12.
$712KZone 4H1. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3G: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2O: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2D: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-H: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1-4. State education fee paid: $185.12.
$712KZone 3-MA. Remove and replace ceiling, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3D: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-D: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4M. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3D2: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2F: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2N. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4G: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-K: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 2B: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 4N. Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 1-B: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KZone 3F: Remove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12.
$712KRemove and replace ceilings, floor covering, and wall covering in the Tower on floors 1–4. State education fee paid: $185.12. Electrical: 250 devices installed; replace lights and wiring in the Tower section of the building, and low-voltage wiring. Plumbing: On the second, third, and fourth floors: 1 water closet, tub, shower, laundry tub, and floor drain; 2 sinks. On the First floor: 1 water closet, tub, shower, laundry tub, and floor drain; 2 sinks. Drains and vents in PVC and cast iron; water in copper and PEX. Plumbing (2): Reposition sprinklers in common areas for renovations.
$712K