Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Plumbing Work
Remove old percent for new shell upgrade.
$12.9KModification to the existing fire sprinkler system at 601 Merritt 7.
$2.6KInstallation of fire sprinkler system.
$65KDesign, provide, and install a new wet fire sprinkler system.
$44KAdd and/or relocate existing sprinkler coverage.
$8KReposition sprinklers in the Nuvance 114 suites to provide proper protection for the new partition and ceiling layout.
$25.8KAdd and relocate sprinklers to accommodate the new tenant partition and ceiling layout.
$45.7KModifications to the existing fire sprinkler system.
$6.8KInstallation of a fire sprinkler system.
$95KInstallation of a new wet-pipe fire sprinkler system.
$85.5KModify fire sprinkler on first floor; H21-0811-Mech No Fee: Propane new gas line in ceiling for new HVAC unit.
$10.2KModification to the existing fire sprinkler system at SMH operations.
$6.8KModification to existing fire sprinkler-dr. Daniels.
$8.3KModification to the existing fire sprinkler system.
$9.7KInstallation of a new combination wet-pipe sprinkler system/manual wet standpipe system; installation of a new dry-pipe sprinkler system.
$244KInstallation of a fire sprinkler system in Building "C" of Grist Mill Village.
$1.7MModification of the existing fire sprinkler system.
$6KModifications to the existing fire sprinkler system.
$5KFire sprinkler system tenant fit-out modifications to the existing system.
$39KModifications to the existing fire sprinkler system.
$45K