Install gas-fired heating and cooling equipment. The basement unit will serve the basement and first floor, with a damper system. The attic unit will serve the second floor. American Standard equipment; installation to include ductwork. First floor: 2 1/2-ton air conditioning, 80000 Btu. Second floor: 3-ton air conditioning, 100000 Btu.
Install ductwork, furnaces, and air conditioning. An attic unit will supply heat and air conditioning to the second floor and over the darage; the system will be zoned. A cellar unit will serve the first floor. Attic: 5-ton; Basement: 3-ton.
Install 2 air conditioning and heating systems, one for first floor. And other for finished basement; 1 furnace to be placed in attic, one in basement.
Change ductwork in the new family room and kitchen; change the 1st fompany hydroair unit to a 5-ton air handlers; the existing family room/kitchen condenser to stay; install ductwork for the kitchen hood.
Install 4 high-efficiency heating and air conditioning systems, with 2 systems to be placed in the basement and 2 in the attic. Equipment by Amana: 4 variable-speed gas furnaces and 4 air conditioning condensers, 16 SEER, 2-stage.
Install a new air conditioning system for the first floor and basement. Air handlers to be placed in the garage; condenser to be placed next to the other condenser for 2nd fr. On a platform 8 ft. Above pavement. Equipment: Goodman 2 1/2-ton, 14 SEER.
Install 2 air conditioning systems: 1 for the first floor and another for the second and third floors (to be zoned), with motorized dampers. Amana 16 SEER A, 2-ton (first floor) and 2 1/2-ton for the second and third floors.
Remove furnace; install 2 heating and cooling systems; 2-ton 1 unit in attic and coil to second floor.; 1 1/2-ton second unit to heat and cool the first floor. And basement (zone system) 95% american standard variable speed 16 seer.
Install 2 95% efficient gas-fired furnaces with cooling and all ductwork for the systems. Install Luxaire equipment with 1.5- and 2-ton condensing units.
Mechanical · 2016
Install 2 95% furnaces in each unit: 2-ton units on the second and third floors, and a 1 1/2-ton unit on the first floor. Units to be Luxaire; all with ductwork.
Install new air conditioning system to rooms on second floor. And kitchen, and family room. On first floor; air handlers to be placed in attic; equipment by Amana 16 Seer.
Install 2 air conditioning and heating systems: one for the first floor and another for the second floor and attic. The first-floor furnace is to be placed in the basement, and the second-floor furnace is to be placed in the attic. The second-floor system is to be zoned with a motorized damper. Equipment: 2 gas furnaces, 80 AFUE for the second floor; 2 - 2 1/2-ton and first floor, 95%; condensers by Goodman, 13 SEER.
Install 3-ton hydro air system in garage to provide HVAC and cooling to the area above the playroom; bridge to the main house, stairs, and bathroom. A/R handler to be first floor; condenser to be Luxaire.