Jobs on record4Recorded in our system
Reported work volume$90KDocumented jobs
Average project$30KWhere values are reported
First observed2021Available dataset
Categories2Observed work types
Used for work inNew Canaan2 jobsDarien1 jobsGreenwich1 jobs

Work history

Documented work by property

Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.

Aerial image of 725 Oenoke Ridge, New Canaan, CT

725 Oenoke Ridge

New Canaan, CT
2026Renovation

*. Per authorization-"build new bathroom/bedroom closet."-TPCARPENTRY:- Demo existing hardwood floors - Installation of new frame - 2-by-4-foot" at 16" on center- Installation of new sheetrock, tape, compound and sand - Install new trims matching existing- Install new baseboards matching existing- Install new door casing - Install new door - Installation of new vanity - 30"Frame for new door + install new door and trimsBuild a closet PLUMBING:- Rough in new toilet + intallation- Rough in new vanity sink + installation- Rough in new faucet + installation - Rough in new shower drain - Pass 3" drain line and water lines - Install new Schluter Kerdi Drain - Finish: T. B. D. Install new shower rough valves + all new fixturesELECTRICAL: - Relocate outlet and switch - Install 2 new recessed lights 4" can - Install 1 new shower ceiling recessed light 4" can - Install 1 new GFCI - Vanity receptacle - Run new dedicated line 120V 20A for new GFCI- Run new dedicated line 120V 15A for new recessed lights and new fan- Installation of 4 gang switch/outlet receptacle - Install Switch Decora regular - (1 for fan, 1 for sconce, 1 ceiling light and 1 for shower ceiling light)- Install new PANASONIC exhaust Fan- Vent it outside + install exterior grillTILE WORK:- Apply cement mud job to shower floor - Instal shower floor waterproofing liner- Apply two coats of waterproofing to shower walls - Install DITRA XL underlayment on plywood subfloor- Install new tiles on shower walls, floor and ceiling. Install new tiles on bathroom floor area - Apply grout to all tile areas- Install marble door saddle and curb saddle PAINTING:- Apply primer + Apply two coats of paint -.

$25K
Aerial image of 462 Main St, New Canaan, CT

462 Main St

New Canaan, CT
2025Renovation

Renovate and enlarge the kitchen, changing the layout. On the second floor, convert the den into a bathroom and walk-in closet. Remove the spiral stairs, relocate the window, and create a primary/master bedroom according to the proposed plan.

$45K
Aerial image of 12 Bailey Ave, Darien, CT

12 Bailey Ave

Darien, CT
2023Renovation

Kitchen Remodel.

$20K