29 Mimosa Dr
Greenwich, CT3 jobs on recordElectrical Work
View all 3 jobs
- 2023Electrical
Electrical Work
- 2023Plumbing
Plumbing Work
- 2023Building Permit
BUI - Residential
$11.4K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Electrical Work
Electrical Work
Plumbing Work
BUI - Residential
$11.4KAmendment 2 - Res
$25KAmendment 2 - Res
$25KHVAC
New 1 bdrm, full bathroom, kitchen renovation and mudroom add'tn State ed fee paid $33.80 electrical: wire kitchen, new mud room and new bedroom. PLUMB: install 1 kitchen sink, hot and cold lines; gas stove connection 30" ice maker Amend # 1: 12.31.20 val 50,000 fee $803 interior fit out for office tenant on second floor west side.
$130K12'x8' swim spa.
$6KRemodel the kitchen, renovate 2 bathrooms, and add 1 new bath. State education fee paid: $26.00. 5/21/21: Change of contractor, $40.00. Electrical: 45 devices installed; remodel kitchen and 3 bathrooms. Plumbing, Second floor: 1 water closet, tub, basin, and shower; 2 shower valves; 1 double vanity sink; 1 swasher.
$100KFirst-floor bath update: new floor tiles, paint, and trim; master bath. Update: new floor tile, tile around paint, kitchen upgrade, new cabinets, countertop, paint throughout the house (interior), and refinish floors. State education fee paid: $10.92. Electrical: 200-amp service upgrade; 42-circuit breaker panel; 2 ground rods; grounding of water and gas line; run feeder for new condenser; run feeder for new air handlers Electrical (2): 35 devices installed; wire up kitchen and 2 bathrooms. HVAC: Install central air conditioning system on the first and second floors; toe-kick hydronic located in breakfast area; 1 garage hydronic Modine heater. Plumbing: Basement: 1 water closet, sink, clothes washer. First floor: 1 water closet, tub, basin, sink, dishwasher. Second floor: 1 water closet, tub, shower, sink. Relocate gas line for stove.
$42KRepair deck by replacing rotting wood; keep all original joists. State education fee paid: $5.20.
$20KRearrange washer/dryer. New powder room, bathroom, floor tiling, and shower tiles. Sheetrock and paint. State education fee paid: $5.20.
$20KFinish floor tiles; finish walls; paint walls and ceiling; tile master shower; finish master bath. State education fee paid: $3.38.
$13KMaster bath and guest bath renovation: new wall and floor tiles, new bathtub, vanity, lighting, fixtures, toilets, and paint. Kids’ bath upgrade and office bath upgrade. Roof repair. State education fee paid: $15.08.
$58KKitchen cabinet upgrade and floor replacement; paint master bath tile shower; replace faucets and vanity; new floor; door replacement and painting; replace toilets and vanities in 3 small baths; basement ceramic floor installation. State education fee paid: $1, 30.
$55.8K