82 Nearwater Ln
Darien, CT- 2026Roofing
Re-Roof.
$12K
Local provider profile
Documented work across Connecticut based on attributed municipal records.
Contact information
These details have not necessarily been claimed or independently confirmed by the provider.
Work history
Individual records are grouped by address. Totals include only values reported in public records and may not equal final construction cost.
Re-Roof.
$12KInterior renovation at a single-family residence: repair fire damage; install a new roof; work on the kitchen, bathroom, and living room; replace windows; install a new landing and stairs at the front; and repair porch steps.
$140KConstruct a 2-story addition to a single-family dwelling consisting of 3 bedrooms, 2 full baths, and 624 new construction. Construct a new deck. Renovate the first floor with a new kitchen, mud room, laundry, and entry.
$175K1 Alteration
$65KAlteration
$185KPLU
Add To & Alter
$85KNew flooring throughout, new wall painting, new LED lighting, a new air-conditioning split system, and a new acoustic ceiling. State education fee paid: $45.50. Electrical: Replace existing lights with new LED lights; add 8 outlets and power for air-conditioning units.
$175KUpdate existing bathrooms 3 and kitchen, paint and floor finishing. State Ed Fee Paid $22.10 Amend #1: 1.29.20 fee $40 change closet and bathroom lapouts second floor Amend #2: 4/15/20 Partial addition to 2 car garage, add 2 bathrooms to bedroom wing ground floor $85,000 permit fee:$1105.00 educ:$22.10 rec 20-0670 Amend #3: val $350,000 fee $4,741 first floor: renovation entry, relocate kitchen and dining, nanny bedroom second floor: addition, stair, hallway bridge, master bedroom, balacony; 20-1219 PLUMB: First floor: 2 water closets, basins, 1 shower, sink; Second floor: 3" water closet, s basins, 2 showers, 1 tub, sink, clothes washer HVAC: oil to propane conversion; remove and discard exist. boiler, water htr. And oil tank; install nat. Gas boiler and convert it to propane; all nec. Piping and low voltage wiring; install propane line from otside to boiler room; install hydro air system with air conditioning HVAC (2): 1000 gallon. U/g liquid propane tank install and 100 ft. Of 5/8" copper and 40 ft. Of 3/4" plastic to house electrical: 137 devices installed; wire for new bedrooms 4: new recessed lights, new outlets, dedicated circuits, living, sittingroom and recessed lights, outlets, new laundry: washer, dryer, wiring new bathrooms, 5 new GFI outlets, recessed lights, fans; wire mudroom: recessed lights, outlets, wire garage: lights, gfi outlets electrical (2): security and fire alarm electrical 3 400-amp underground service, 2 panels, 1 outlet.
$85KUpdate vanities and tub, sinks, shower and tile in 2 existing bathrooms. State Ed. Fee paid.: $8.32.
$31.5KUpdate to the kitchen and powder room; build a new pantry and add a gas fireplace. State education fee paid: $22.10. Electrical: 58 devices installed; new wiring for the kitchen, powder room, breakfast area, living room, new recessed lights, switches, outlets, and porch for an air handlers Air conditioning compressor electrical (2): upgrade the existing low-voltage burglar, fire, and CO2 alarm system. Plumbing, First floor: 1 water closet, dishwasher, 2 sinks; gas for the kitchen, stove, fireplace (air furnace). HVAC: install a new 95% efficient natural gas-fired furnace and split air conditioning system in the attic, using existing ductwork.
$85KAlterations to the existing bathroom and kitchen. State education fee paid: $19.50. Plumbing on the fifth floor: replace water closet and dishwasher; new clothes washer; move shower and sink. Gas range. Electrical: 25 devices installed; 1: range, oven, clothes dryer, dishwasher. Rewire kitchen and bathroom. Demolition as needed; wire new washer/dryer; miscellaneous other electrical.
$75KUpdate: 5 bathrooms, kitchen update, HVAC, insulation upgrade, and new windows. State education fee paid: $102.70.
$395KInsulate walls, new windows and siding; Upgrade bathrooms and kitchen. Required egress window to comply with 2009 IRC R310 State Ed. Fee paid.: $48.10 Amend #1: 3.7.16 val $$35,000 fee $504.10 second floor bedroom bump out, bedroom bay window Amend #2: 5.25.16 val $65,000 fee $921.90 bump out and deck Amend #3: 10.2516 fee $100 finish existing basement for bedroom, family room, bathroom, home office electrical: 140 devices installed; 1: oven, dishwasher, 2 air conditioning motors; install wiring for remodel project includ. 20 recess lights, 25 surface lights, 3 flood lights, 35 switches, 50 duplex receptacles, 3 bathroom. Exhaust. Fans, sep. Circuit GFI's in baths, 3 vanity lights, stove, dishwasher, 2 island receptacles, 6 counter top GFCI receptacles; hood fan, refrigerator and microwave PLUMB: First floor: 1 nw: water closet, sink, replace 1: sink, dishwasher; Second floor: replace 2: water closets, tubs, replace 1: shower, replace 4; sinks, 1 nw: clothes washer; install new gas piping for kitchen stove and boiler in basement HVAC: install 2 hydro air systems; install boiler/hot water heater bathroom, laundry, kitchen hood. Amendment (9/22/16): air conditioning condensers.
$185KAdd 2 rooms on the second floor; update windows, roof siding, and fleating. State education fee paid: $149.50. In accordance with Section R314.2, CSBC, the Household Fire Alarm System installed under this permit is required to be owned by the owner. The owner is responsible for having the system maintained in accordance with NFPA 72 and monitored by an approved supervising station in accordance with NFPA 72. HVAC: Install 3 hydro air systems with ductwork; install high-efficiency boiler and water heater, and bath, kitchen, and laundry fans. Plumbing: First floor: move 4 water closets, showers, and sinks; move 1 clothes washer and dishwasher; install 1 new shower; move 2 showers. Second floor: move 1 water closet, tub, and sink. Electrical: 200 devices installed; 2 ranges, 2 ovens; install electrical wiring for first-floor renovation, including 80 recessed lights, 50 receptacles, 40 switches, 8 smoke detectors, oven, stove, refrigerator, dishwasher, disposal, 10 separate circuits, GFCIs, hood, 2 exhaust fans, 10 sconces, 1 a/r handler and compressor. Amendment (11/16/16): Replace existing 200-amp overhead service with 200-amp underground service.
$575KUpdate kitchen and bath. Insulation, new windows replaced new siding State Ed fee paid $14.82 Amend #1: 12.15.16 fee $40 front portico roof and rear deck.
$56.5K