Within Best Roofing-Rip water and ridge vent center vent, seams. Prep Buy: Disconnect/reconnect electrical to the Amazon Playtable. And replace 20 squares using architectural GAF shingles, 6 feet ice and water barrier, synthetic underlayment with taped plywood seams, new and drip edge and all new pipe bootsSiding-18 squares new vinyl siding, soffit, and accesssory blocks, 3/8 full insulation and insulation tape all and wrap entire house with synthetic underlayment. White coil wrap.
Replacement Installing a existing boiler of all existing TVSS Surge Protectors connected to I. T. Panels. 4-ton heat pump and zoning unit. Ductwork into the new addition. The will also have an extended loop, into this new room for the severe.
Disconnect and reconnect power and data to replace the paint desk.
$12.5K
2025Electrical
Within Home Depot, disconnect then reconnect electrical to the UPS in the computer room.
$2.6K
2024Ele Alt Comm
SCO/L shelf checkout: 1 IG duplex - R circuit, cash machine: 1 IS/IG circuit -beverage coolers: 1 LC quad (24 hour power) - up to 3 on same circuit, PVM monitors: 1 IS quad (24 hour power) EACH.
$45K
2024Ele Alt Comm
Replace TVSS devices connected to I.T.-related 120/208 V panels with new model.
$3K
2023Ele Alt Comm
Install dirty power (24-hour) duplexes for locking CAT equipment based on prints.
$11.5K
2023Ele Alt Comm
Install a duplex receptacle (LC circuit/gray receptacle) for a new minute key machine.
$1.8K
2022Electrical
Disconnect lights in bays 05-006,04-017 and reconnect lights in 04-017,04-019, disconnect all electrical in bays 04-Ec2,03-020, and 50-013, and disconnect lights in bays 34-001,34-003,34-005,34-007, and 34-009 - install quad receptacles behind bays.
$5K
2022Ele Alt Comm
Disconnect lights in bays 32-0006 thru 32-016 and 32-001 thru 32-015, install quad receptacles in bays 32-006 and 32-001.
Electrical work for an office remodel: tenant fit-up for “Protos Security” on the 5th floor, with interior alterations.
$378K
2023Demolition
Demo existing electrical work, security system and telecommunications in existing 4000 space located on 5th floor - install new electrical lighting, and electrical devices in the space for new tenant.
Disconnect electrical service to gondolas being moved for a floor reset, make electrical service in the ceiling safe, and reconnect electrical service to each gondola after it is reset on the new floor.