10 rotisserie ovens, 2 makeup air units, 7 radiant heaters, and 1 rooftop unit (gas piping).
$40K
2025Demolition
Domestic hot and cold, sanitary drain waste and vent, storm and condensation drainage for freshline/members restrooms/food court/optical/heating/pharmacy/demo existing, water service for new tire center, elevator and parking ramp sump pumps with discharge piping.
$470K
2025Mechanical
Gas piping for chicken oven and pizza ovens, and a snowmelt boiler.
$110K
2025Plumbing
Storm drainage.
$287K
2024Plumbing
Water main to dwelling, bathroom, hose bibs, drain, waste, vent, and domestic hot and cold irrigation.
$82K
2024Mechanical
Gas piping, RH n2 and air piping.
$67.5K
2024Plumbing
Underground plumbing to tie in trailer.
$64K
2020Plumbing
Remove and reinstall existing fixtures; replace the existing mop sink with a new one.
Mechanical: gas piping for cooktop, water heater, furnace, and BBQ.
$3K
2018Plumbing
Plumbing: kitchen sink, dishwasher, water heater, washing machine, outside/inside faucet in basement; tub with tub/shower valve, water closet, and sink in first-floor bathroom; shower valve with handheld shower head and rain head in second-floor bathroom.