Skip to content

Work at this address

168 Lost District Dr

New Canaan, Connecticut · Parcel 28/140/19
6 matched work records at this property, plus documented work nearby.

Work at this address

Recorded work history

6 matched records · $356K in reported work value.

YearWorkDescriptionReported value
OtherBPR-25-46 · Revision

Fabrication of a deck around a renovated sunroom.

Provider: Chris Sweeney
$12K
RenovationBP-25-234 · Renovation/Remodel

Installation of new windows, NanaWall, skylights, and a sliding door for the kitchen/sunroom; structural steel and timber framing to accommodate; footing/foundation work necessary for glass installation and structural framing; all interior electrical roughing and finishing for the kitchen and sunroom only; installation of cabinets and finish carpentry. Work per attached plan. No work on the property not included on this plan is covered by this permit. BPR-25-46: fabrication of a deck around the renovated sunroom.

Provider: Edgewood Carpentry & Contracting
$150K
RenovationBP-25-216 · Renovation/Remodel

Stone patio to replace the exact footprint of the former wood deck. Adding an outdoor kitchen. Per applicant: “Zero water for the outdoor kitchen, just two beverage centers.”

Provider: Jeanette Lee
$30K
RenovationBP-25-39 · Renovation/Remodel

Kitchen: Replace kitchen and pantry in same layout, new appliances, countertops and backsplash. Move and replace 1 window. Replace existing 6" recessed lights with 3" recessed lights, install under cabinet lighting, replace dining room wood floor and kitchen tile with wood floor to match existing floor. Dining area: Remove 2 windows and install Sliding Doors to exterior. Powder room: Remove powder-room to extend kitchen, Strip out laundry room and create new powder room with toilet bowl and sink. Primary bathroom: Replace bathroom in same layout - Toilet, vanity, tub, shower, wall and floor tile. Open (non-bearing) walls in primary closet, remove 2 doors. Bathrooms: #2 and #3 Replace floor and wall tiles, replace vanities and accessories. Throughout: Refinish floors and stair-treads, replace baseboards, door trim, window trim, paint all areas - walls, ceilings, doors, windows. Foyer: Replace wood flooring with marble tile. Lighting: Replace 6" recessed lighting in bathrooms with 3" recessed lights. Switching: Replace switches with dimmer switches. 7/28/25: Email received from the general contractor: they are not doing the kitchen work.

Provider: Fine Construction Services Inc.
$150K

Work near you

Providers used near 168 Lost District Dr

Showing documented work within 1 mile. Markers are work locations—not provider offices.

Work near this address

This map uses standard image tiles and does not require WebGL.

Open the map
View larger map

Providers used nearby

33 local providers to explore

Grouped by specialty, with uncategorized work last. Within each specialty, providers are ordered by recent documented work and nearby job count.

New builds

8 providers
ProviderNearby workSpecialtiesDetails

Renovations

6 providers
ProviderNearby workSpecialtiesDetails

Plumbing

4 providers
ProviderNearby workSpecialtiesDetails

Electrical

1 provider
ProviderNearby workSpecialtiesDetails

HVAC

1 provider
ProviderNearby workSpecialtiesDetails

Roofing

2 providers
ProviderNearby workSpecialtiesDetails

Pools

7 providers
ProviderNearby workSpecialtiesDetails

Other

4 providers
ProviderNearby workSpecialtiesDetails
Source and record coverage

Property facts come from Connecticut’s statewide Parcel and CAMA release. Owner and mailing-address fields are not published here. This page includes work history confidently matched to this address.