Skip to content

Work at this address

Hunters Ln

Norwalk, Connecticut
23 matched work records at this property, plus documented work nearby.

Work at this address

Recorded work history

23 matched records · $45.9M in reported work value.

YearWorkDescriptionReported value
OtherB25-1314 · Build Alt Comm

Relocate an interior door and add an interior partition.

$30K
ElectricalE23-0821 · Electrical

Add plugs and switches in new partitions.

Provider: Steven B Rudolf
$3.9K
OtherB23-0996 · Build Alt Comm

Interior renovations to room 0400 as per plans.

$20K
OtherZ23-0716 · Zoning

Interior alterations to room 0400 of school as per plan - no change of use.

RenovationB22-1034 · Build Alt Comm

Interior renovation to a classroom at Ponus Ridge for Verizon Innovative Learning.

Provider: Whiting Turner Contracting Co (The)
$125K
OtherZ22-0414 · Zoning

Construct an outdoor learning space at the rear of Ponus Ridge Middle School. The structure height must not exceed 15' to the midpoint of the roofline. Rear setback: 25'.

ElectricalE21-1194 · Electrical

Electrical-solar 3p 400-amp-480 breakers.

Provider: Brandon D Sheridan
$426K
SolarB21-1376 · Solar Permit

Install 748 roof-mounted solar panels. No structural upgrade.

Provider: Brandon D Sheridan
$426K
ElectricalE19-0710 · Electrical

Electrical - building automation - HVAC temp controls - low voltage.

Provider: Richard J Haley Jr
$270K
PlumbingP19-0325 · Plu Alt Comm

Plumbing: New fire sprinkler system for an existing renovated building and a new addition at “Ponus Ridge School.”

Provider: Patrick B. Jasunas
$910K
MechanicalH19-0276 · Mechanical

Mechanical: Replace RTUs and boiler burners; install HHW and refrigeration systems.

Provider: Frank Grande
$7.5M
PlumbingP19-0210 · Plumbing

Plumbing - New water, new fixtures, new SWV, storm and domestic water piping.

Provider: Frank Grande
$1.6M
ElectricalE19-0349 · Electrical

Electrical: Install new CAT 6 data cabling, classroom audio-visual systems, and a new underground service at Ponus Middle School.

Provider: David T Bane Jr
$1.4M
ElectricalE19-0177 · Electrical

Electrical renovations and additions at Ponus Ridge Middle School, per plans and specifications.

Provider: John E Shea Jr
$3M
ElectricalE19-0152 · Electrical

Electrical: Disconnect existing modular building.

Provider: Thomas P Collins III
$2K
AdditionB19-0098 · Build Alt Comm

Renovations and an addition to the existing school, “Ponus Ridge Middle School.”

Provider: Newfield Construction
$30M
AdditionZ19-0098 · Zoning

Renovations and additions to the existing school building; 41,099 new construction. Ponus School addition and renovation project – 0918 5010 5777 C0608.

AdditionD18-474 · IWW Minor Permit

Ponus school addition.

ElectricalE17-0565 · Ele Alt Comm

Electrical: Install cabling for security cameras and 1 outlet in the main office at “Ponus Ridge Middle School.”

Provider: Mark L Grabowy
$8K
OtherS17-0026 · SGN SGN

Install replacement ground sign for “Ponus Ridge Middle School.”

$1K
Other2017-33 · Zoning

Replace ground sign “Ponus Ridge Middle School.”

Work near you

Providers used near Hunters Ln

Showing documented work within 1 mile. Markers are work locations—not provider offices.

Work near this address

This map uses standard image tiles and does not require WebGL.

Open the map
View larger map

Providers used nearby

51 local providers to explore

Grouped by specialty, with uncategorized work last. Within each specialty, providers are ordered by recent documented work and nearby job count.

Renovations

9 providers
ProviderNearby workSpecialtiesDetails

Plumbing

5 providers
ProviderNearby workSpecialtiesDetails

Electrical

19 providers
ProviderNearby workSpecialtiesDetails

HVAC

14 providers
ProviderNearby workSpecialtiesDetails

Solar

4 providers
ProviderNearby workSpecialtiesDetails
Source and record coverage

Property facts come from Connecticut’s statewide Parcel and CAMA release. Owner and mailing-address fields are not published here. This page includes work history confidently matched to this address.